• Loop the line’s eye over the ends of the cleat
• Pull the dock line snug tying the line to a standard dock cleat is also a three-step process. With the mooring line in hand: • Wrap the line around the base of the cleat
• Pull the line over the top and around the opposite ends of the cleat to create a figure eight